CMS has been busy upping the consequences for PTAN enrollment failures. Assuming any error is evidence of fraud, waste, or abuse, the new default is immediate, and sometimes retroactive, revocation of Medicare billing privileges.
There is an alternative pathway for certain enrollment problems easily remedied with updated supporting documentation or corrected PECOS enrollment records.
It is called a stay of enrollment, or stay, and CMS recently expanded its use. Compared to revocation, stays of enrollment offer suppliers a much faster method to restore normal billing privileges. They are not, however, friendly reminders. The curative window is short, and mishandling the response ends in complete PTAN revocation.
Stays of Enrollment are Better Than PTAN Revocations
Medicare enrollment is not terminated during a stay. Instead, certain access and privileges are paused. Until the stay is resolved:
- New claims are rejected,
- Same and similar eligibility access is disabled, and
- Payments are suspended.
That sounds a lot like a revocation, but the difference is the pathway back to good. Unlike a revocation that requires a lengthy appeal and reinstatement process, national provider enrollment contractors (NPEs) lift stays within 10 days of receiving corrective documentation. That means the supplier can resume and continue billing while the NPE continues to process the application.
Claims bounced during a stay are also easier to reset. Because claims are rejected during the stay, suppliers simply resubmit them after the stay is lifted. In contrast, DME MACs deny claims during a revocation, so suppliers must go through a much lengthier appeal process when and if the PTAN is eventually restored.
Respond Quickly and Completely
Suppliers have 30 days from the beginning of the stay of enrollment to cure the underlying problem. NPE contractors send notifications via regular mail and email to the addresses in the current enrollment application, and the clock starts when the notice is sent, not when it is received. Payments are often suspended within 24 hours, and suppliers often don’t receive paper notices until days or weeks later. To take full advantage of the 30-day response window, suppliers should routinely check and update the email addresses for authorized personnel.
And while the stay is lifted upon receipt of corrected information, updates that ultimately fail to meet standards will almost certainly result in revocation.
Stays cannot be renewed or extended, and unresolved stays automatically advance to complete PTAN revocation actions. Responses must be quick and thorough to benefit from the second chance stays of enrollment offer.
When Stays of Enrollment Apply
CMS recently updated the specific scenarios in which the stay of enrollment is engaged before revocation. With its May 18, 2026, change order, CMS lists six:
- Missing revalidation applications.
- Rejected revalidation applications.
- Rejected change of information applications.
- Site visit deficiencies.
- Surety bond cancellations.
- Liability insurance cancellations.
It is important to note that these errors are related to administrative corrections. For example, if a supplier changes liability insurance carriers but forgets to update the enrollment application and upload a copy of the new policy, they can resolve the problem via a stay of enrollment. If, however, the supplier allowed the required coverage to lapse and was not covered for a period of time, that is a violation of supplier standards that cannot be resolved via the stay of enrollment.
Stays of enrollment do a better job of matching the redemption pathway with the underlying offense, but they are serious. To take advantage, suppliers should ensure email contact information is correct and submit a complete response within the window.